| Date estimate (mean and 95% HPD*) | |||||
---|---|---|---|---|---|---|
Divergence event |
|
|
| |||
Indian-Javan | 13.2 | (11.7 – 14.6) | 13.4 | (11.7 – 15.2) | 12.9 | (11.5 – 14.2) |
Black-White | 15.3 | (13.5 – 17.4) | 15.9 | (13.5 – 18.5) | 15.1 | (13.6 – 16.7) |
Woolly-Sumatran | 19.8 | (17.8 – 21.9) | 20.6 | (18.4 – 22.8) | 19.6 | (17.5 – 21.5) |
Node A | 30.6 | (28.0 – 33.3) | 30.5 | (27.7 – 33.4) | 30.4 | (28.0 – 33.0) |
Node B | 31.6 | (29.2 – 34.3) | 32.0 | (29.1 – 34.8) | 31.5 | (29.0 – 34.0) |